Scroll down to read more about the project
This design build project was challenging and fast tracked. Access off Gerrard Street and the rear of the building was limited, so material delivery had to be coordinated carefully without use of an elevator at the time during the pandemic. The project featured major demolition, building and occupancy permits, and renovations were extensive and modern.
Size: <3,700 sq. ft.
Timeline: 12 weeks
@ Taurus Contracting 2023 / Powered by OpenCore Group